Electrical Substation Construction Benchmark Duration

Electrical Substation Construction Duration Benchmark Report

This Project Forecast report identifies the pessimistic, likely and optimistic benchmark duration to construct a new electrical substation.

The duration benchmark report identifies rates based on the upper capacity limit of the substation.

The benchmark rates are expressed in weeks.

This report is current as at December 2013.

Download this construction duration benchmark today.

electricity-transmission

Advertisements