Geothermal Power Station Construction

Geothermal Power Station Construction Duration Benchmark Report

This Project Forecast report identifies the pessimistic, likely and optimistic benchmark duration to construct a new geothermal power station.

The duration benchmark report identifies rates based on the generation capacity of the power station in MW.The benchmark rates are expressed in weeks per MW.

This report is current as at December 2013.

Download the construction duration benchmark report today.

Geothermal Power Station